I am level 23 and thinking to start my own gold production.
Here's my Formula:
300 Gold Mine Buffed = 600 Ore (12 minutes production time)
2 Ores when buffed
600 Gold Ore Smelter Buffed = 600 Bar (12 minutes production time)
2 Ores = 2 Bars when buffed
600 Gold Bar Coinage Buffed = 300 Gold Coins. (24 minutes production time)
40 Gold Bar = 10gc not buffed
400 Gold Bar = 100gc not buffed
600 Gold Bar = 150gc not buffed (600 Gold Bars when you kept buffing your Mines and Smelters)
Grand finale:
600 Gold Bar = 300gc Buffed.
Everything's Based on level 1 Gold mines, Gold Smelters and Coinages.
A Gold Mine Costs 150gc to run.
Approx. of 20 Baskets(maybe less) - 120 gc
Correct me if im wrong guys. My head hurts lol.
Summary:
Not Buffed:
Gold Mine: (12 Minutes Production Time)
300 Gold Mine = 300 Ore
Gold Smelter: (12 Minute Production Time)
300 Ore = 150 Bars
Coinage: (24 Minute Production Time)
150 Bars = 37.5 Gold Coins
Buffed:
Gold Mine:
300 Gold Mine = 600 Ore
Gold Smelter:
600 Ore = 600 Bar
Coinage:
600 Bar = 300 Gold Coins.
There's a very big difference when your gold production chain is not buffed.


Reply With Quote
) but untill you can produce 300gc + daily min, not worth it.
