Certain buildings (wells, mines, etc) show the amount of resources left. The color of that resource should be yellow if it's below 30% and red if it's below 10% (of a standard deposit). So if you click a medium well and it has less than 450 water left, the number would be in yellow; if less than 150 it would be red.
This would let you easily see which deposits are going to expire, need to be replaced, or need to be refilled.


Reply With Quote

